Cobb County Water System – South Cobb Water Reclamation Facility Chemical Systems Upgrade

The Cobb County Water System hired Engineering Strategies, Inc. to provide a design to replace the entire ferrous chloride feed system, to replace existing metering pumps for several chemicals with peristaltic pumps and to evaluate the conversion of the existing hypochlorite system for effluent disinfection from bulk chemical use to an on-site hypochlorite generation system. The ESI team conducted workshops and prepared a Design Development Report that served as the basis of design. The team also prepared construction drawings and technical specifications for the improvements that will be constructed beginning in 2014