Google Effluent Treatment Plant – ESI provided process design for a state-of-the-art Effluent Treatment Plant constructed by Google that treats spent cooling water prior to discharge to the Chattahoochee River in Georgia.
New Treatment Plant Opens at Lake Lanier Islands Resort – Facility Treats Wastewater to High Standards; Has Room for Expansion The new plant uses the latest advanced membrane biological reactor technology to process wastewater at the 1,100-acre resort. Built on a 4.25-acre hillside site, the majority of the operations are housed inside two buildings that […]
City of Griffin Still Branch Project wins Engineering Excellence Award – Engineering Strategies, Inc. and the City of Griffin won an Honor Award in the Georgia Engineering Excellence Awards for a water supply project that consisted of an intake on the Flint River, a 475-acre reservoir on Still Branch, pump stations at the river and […]
ESI provides design and assistance during construction on water transmission projects. Recent projects in Georgia include 32 miles of ductile iron pipe ranging from 20-inch to 42-inch in diameter for the City of Griffin and 4 miles of 16-inch water and reuse mains for Paulding County.
ESI worked with the Gwinnett County Department of Water Resources to provide engineering services for planning, design, and construction administration for force main odor control improvements at the F. Wayne Hill Water Resources Center.
The Cobb County Water System has selected ESI to provide the design and engineering of approximately 6,000 feet of a sanitary outfall sewer. This outfall sewer will replace an existing line that is aged and undersized. Included in the scope of services is field survey and data collection, route selection, preparation of preliminary and detailed […]
With respect to water loss control and improving water supply efficiency, ESI, in association with Smart Water Analytics (SWA) has just been selected by GEFA to develop pilot pressure management evaluations and District Metering Areas (DMAs) for four water systems in Georgia. SWA is the lead firm of the GEFA project team which also includes […]
ESI, in association with Smart Water Analytics (SWA), developed hydraulic models in WaterCAD® for 14 different water supply projects. The models were set up for 2035 water demands and prepared to run on Extended Period Simulations (EPS) for a minimum of 48 hours. The models were used to set the baseline conditions for new projects […]