Peachtree MHP Pump Station

ESI has completed the design for Gwinnett County’s latest pump station improvement project. Gwinnett County will be accepting bids from contractors on January 14th, 2020.

 



Project Description:
The project involves modifications to the existing Peachtree Mobile Home Park (MHP) Pump Station (PS) including mobilization and demobilization, site clearing, site staking, excavation and grading, bypass tee installation, bypass pumping, demolition of facilities to be removed, installation of influent gravity sewer modifications, installation of a precast concrete structures, modification to the existing wet well, installation of a duplex submersible pump system, installation of flow meter and vault, site yard piping and valves, electrical and control system modifications, site concrete paving, site fencing, a concrete access driveway, finish grading, erosion control and site stabilization, and all related appurtenances for a complete and functioning system.

The work also includes installation of approximately 450 feet of 8-inch ductile iron gravity sewer, 80 vertical feet of precast concrete manholes, connection to existing sewers, installation of approximately 1,500 feet of 4-inch and 6-inch ductile iron force main, a new composite discharge manhole, connection to the existing sewer, installation of approximately 1,000 feet of 12-inch ductile iron watermain, two fire hydrant assemblies, four gate valves, connections to existing water mains, reconnection of existing water service connections, repaving Pine Street, driveway cut restoration, sidewalk restoration, curb and gutter restoration, site restoration with sod and permanent grassing, erosion and sedimentation control, and all related appurtenances for a complete and functioning system.

Bid Information

Information on this project, including how to obtain plans and specs, is available on our website.

Peachtree MHP PS Improvements

WordPress Appliance - Powered by TurnKey Linux